Bow Front Desk with Lateral Credenza and TableThe Cherryman office furniture set in the picture has a Black Cherry finish and it includes a bow front desk with grommets for cable management and a round meeting table. It also has a credenza with four lateral drawers, each with a distinct machined aluminum pull. All components have a durable melamine surface that is scratch resistant and it is available in different finish options. Quality backed by a 10-year manufacturer's warranty. This item is currently not available to purchase. Check out these related items: ![]()
Stool Bar Chair
$395.00
![]()
Circle Folding Table
$325.00
![]()
Vinyl High Back Conference Room Chair
$435.00
![]()
Credenza Desk Shell
$305.00
![]()
8 Person Workstation with Privacy Panels
$12,550.00
![]()
U Shaped Desk with Glass Modesty Panel and Hutch
$2,520.00
|
Condition | New |
Brand | |
Series |
Available Finishes | Black Cherry, Park Walnut, Sienna Mahogany, Valley Grey |
Finish | Black Cherry |
Parts List | A822, A827, A425, A726 |
Material | Aluminum, Melamine |
Shape | Bow Front |
Features | Locking, Grommets, with Credenza, with Drawers, with File Cabinet, with Filing Cabinet, without Hutch, Credenza, Drawers, Filing Cabinet, Storage |
Capacity | 1 Person |
Please note that for items with multiple size options, the parts list may be slightly modified to meet the dimensions requested.
QTY | Part # | Description | List Price | Our Price | Line Total |
1 | A822 | Bow Front Desk Shell 71 x 36/41 | $656.00 | $425.00 | $425.00 |
2 | A827 | 2 Drawer Lateral File 36 x 23 x 29 | $960.00 | $625.00 | $1,250.00 |
1 | A425 | Top for Lateral or Storage Credenza 71 x 23 | $200.00 | $130.00 | $130.00 |
1 | A726 | Round Meeting Table 42W x 29H | $651.00 | $425.00 | $425.00 |
In-stock items typically leave our facility in 1 to 4 business days. If you chose standard dock to dock freight, your items will arrive to you in 2 to 10 business days. Large items may require lift gate service if you do not have a loading dock. Drawers ship fully assembled, most other items are shipped flat-boxed and require assembly. Please note that 2021 supply chain challenges may unexpectedly affect lead times. You will be notified of any changes in your lead time as quickly as possible.