Desk with DrawersThis modern desk with drawers combines an external set of lateral files and your choice of internal pedestal configurations to make a powerhouse of productivity and storage capacity. The corner desk is also available in multiple sizes and finishes, Valley Grey shown. Quality backed by a 10-year manufacturer's warranty. This item is currently not available to purchase. Check out these related items: ![]()
Wardrobe Storage Cabinet
$775.00
![]()
High Back Ergonomic Chair
$1,735.00
![]()
Ergonomic Task Chair with Arms
$460.00
![]()
Splintered - Office Wall Art
$165.00
![]()
Bow Front L Shaped Desk
$795.00
![]()
Tall Round Outdoor Table with Umbrella Hole
$480.00
|
Condition | New |
Brand | |
Series |
Available Finishes | Black Cherry, Park Walnut, Sienna Mahogany, Valley Grey |
Finish | Valley Grey |
Parts List | A622, A324, A827, A838 |
Dimensions | 71" x 107" x 29" |
Material | Melamine |
Shape | Corner, Curved, L Shaped |
Features | Locking, Desk, Grommets, with File Drawer, with Locking Drawers, with Storage, Credenza, Drawers, Storage, without Hutch |
Capacity | 1 Person |
Please note that for items with multiple size options, the parts list may be slightly modified to meet the dimensions requested.
QTY | Part # | Description | List Price | Our Price | Line Total |
1 | A622 | Credenza Desk w/Right CC Ext 71 x 24/36 | $651.00 | $425.00 | $425.00 |
1 | A324 | Return 35 x 24 | $288.00 | $190.00 | $190.00 |
1 | A827 | 2 Drawer Lateral File 36 x 23 x 29 | $960.00 | $625.00 | $625.00 |
2 | A838 | BF Hanging Ped 16 x 22 x 20 | $416.00 | $270.00 | $540.00 |
In-stock items typically leave our facility in 1 to 4 business days. If you chose standard dock to dock freight, your items will arrive to you in 2 to 10 business days. Large items may require lift gate service if you do not have a loading dock. Drawers ship fully assembled, most other items are shipped flat-boxed and require assembly. Please note that 2021 supply chain challenges may unexpectedly affect lead times. You will be notified of any changes in your lead time as quickly as possible.