Desk with Hutch and DrawersThis desk with hutch is available in multiple finishes, Park Walnut shown, and combines a U-shaped desk with a spacious hutch. Keep your workspace organized with integrated drawers and glass-paned shelving. Quality backed by a 10-year manufacturer's warranty. This item is currently not available to purchase. Check out these related items: ![]()
Boat Shaped Conference Table
$1,190.00
![]()
Simple Scandinavian Bar Stool
$275.00
![]()
Double Seat Bench with Link to Table
$4,580.00
![]()
Waiting Room Chair
$345.00
![]()
Triple Column Lockers
$1,375.00
![]()
Mesh Office Chair with Lumbar Support
$355.00
|
Condition | New |
Brand | |
Series |
Available Finishes | Black Cherry, Park Walnut, Sienna Mahogany, Valley Grey |
Finish | Park Walnut |
Parts List | A821, A823, A825, A426, A427, A832 |
Dimensions | 71" x 108" x 29/65" |
Material | Aluminum, Glass, Melamine |
Shape | U Shaped |
Features | Credenza, Desk, Doors, Drawers, Grommets, Locking, Overhead Storage, Storage, with Drawers, with Hutch, with Storage |
Capacity | 1 Person |
Please note that for items with multiple size options, the parts list may be slightly modified to meet the dimensions requested.
QTY | Part # | Description | List Price | Our Price | Line Total |
1 | A821 | Rectangular Desk Shell 71 x 36 | $600.00 | $390.00 | $390.00 |
1 | A823 | Bridge 48 x 24 | $288.00 | $190.00 | $190.00 |
1 | A825 | Credenza Desk Shell 71 x 24 | $420.00 | $275.00 | $275.00 |
1 | A426 | Hutch w/o Doors 71W x 36H | $464.00 | $300.00 | $300.00 |
1 | A427 | Wood Doors for 72W Hutch | $160.00 | $105.00 | $105.00 |
1 | A832 | FF Ped w/o Top 16 x 22 x 28 | $512.00 | $335.00 | $335.00 |
In-stock items typically leave our facility in 1 to 4 business days. If you chose standard dock to dock freight, your items will arrive to you in 2 to 10 business days. Large items may require lift gate service if you do not have a loading dock. Drawers ship fully assembled, most other items are shipped flat-boxed and require assembly. Please note that 2021 supply chain challenges may unexpectedly affect lead times. You will be notified of any changes in your lead time as quickly as possible.