Office Desk with DrawersThis modern U shaped desk accommodates your choice of pedestal layouts with ease. The three-drawer option shown here can be repositioned anywhere within the shell. A lateral file set and a bookcase hutch round out this versatile package. Guaranteed by a 10-year manufacturer's warranty. This item is currently not available to purchase. Check out these related items: ![]()
Wide Chair
$165.00
![]()
U Shaped Desk with Hutch
$2,355.00
![]()
4 Shelf Bookcase - 18" Deep
$530.00
![]()
Metal Shelving
$490.00
![]()
Modern L Shaped Desk with Storage
$1,540.00
![]()
L Shaped Desk with Hutch
$1,970.00
|
Condition | New |
Brand | |
Series |
Available Finishes | Black Cherry, Park Walnut, Sienna Mahogany, Valley Grey |
Finish | Park Walnut |
Parts List | A621, A622, A623, A827, A328, A831 |
Dimensions | 107" x 107" x 29" |
Material | Melamine |
Shape | Curved, U Shaped |
Features | Locking, Desk, Grommets, with Bookcase, with Credenza, with Drawers, with Shelves, without Hutch, Bookcase, Credenza, Drawers, Shelves |
Capacity | 1 Person |
Please note that for items with multiple size options, the parts list may be slightly modified to meet the dimensions requested.
QTY | Part # | Description | List Price | Our Price | Line Total |
1 | A621 | Credenza Desk w/Left CC Ext 71 x 24/36 | $651.00 | $425.00 | $425.00 |
1 | A622 | Credenza Desk w/Right CC Ext 71 x 24/36 | $651.00 | $425.00 | $425.00 |
1 | A623 | Bridge 35 x 24 | $232.00 | $150.00 | $150.00 |
1 | A827 | 2 Drawer Lateral File 36 x 23 x 29 | $960.00 | $625.00 | $625.00 |
1 | A328 | Open Storage Hutch 36 x 15 | $336.00 | $220.00 | $220.00 |
1 | A831 | BBF Ped w/o Top 16 x 22 x 28 | $576.00 | $375.00 | $375.00 |
In-stock items typically leave our facility in 1 to 4 business days. If you chose standard dock to dock freight, your items will arrive to you in 2 to 10 business days. Large items may require lift gate service if you do not have a loading dock. Drawers ship fully assembled, most other items are shipped flat-boxed and require assembly. Please note that 2021 supply chain challenges may unexpectedly affect lead times. You will be notified of any changes in your lead time as quickly as possible.