Peninsula Desk with BookcaseThis modern L-shaped desk is available in multiple finishes, Park Walnut shown, and is manufactured out of a high-quality melamine material that protects the surfaces from scratches. Complete the ensemble with your choice of office chairs, keyboard trays, in-desk storage, and more. Quality backed by a 10-year manufacturer's warranty. This item is currently not available to purchase. Check out these related items: ![]()
Mid Back Task Chair
$470.00
![]()
Open Steel Shelving - 22 Gauge
$400.00
![]()
Desktop Power Grommet with USB
$125.00
![]()
2 Drawer Hanging Pedestal for Heartland Desks
$245.00
![]()
Small Computer Table
$180.00
![]()
Rectangular Desk with Drawers
$675.00
|
Condition | New |
Brand | |
Series |
Available Finishes | Black Cherry, Park Walnut, Sienna Mahogany, Valley Grey |
Finish | Park Walnut |
Parts List | AM-373N, A824, A540, A328, A838 |
Dimensions | 71" x 120" x 29/59" |
Material | Melamine |
Shape | L Shaped, Peninsula |
Features | Locking, Grommets, with Bookcase, with Drawers, with Shelves, without Hutch, Adjustable Shelves, Cabinet, Drawers |
Capacity | 1 Person |
Please note that for items with multiple size options, the parts list may be slightly modified to meet the dimensions requested.
QTY | Part # | Description | List Price | Our Price | Line Total |
1 | AM-373N | Peninsula Desk Shell 71 x 36 | $629.00 | $410.00 | $410.00 |
1 | A824 | Return 48 x 24 | $384.00 | $250.00 | $250.00 |
1 | A540 | 2 Door Storage Cabinet - 36" x 23" x 29" | $496.00 | $325.00 | $325.00 |
1 | A328 | Open Storage Hutch 36 x 15 | $336.00 | $220.00 | $220.00 |
1 | A838 | BF Hanging Ped 16 x 22 x 20 | $416.00 | $270.00 | $270.00 |
In-stock items typically leave our facility in 1 to 4 business days. If you chose standard dock to dock freight, your items will arrive to you in 2 to 10 business days. Large items may require lift gate service if you do not have a loading dock. Drawers ship fully assembled, most other items are shipped flat-boxed and require assembly. Please note that 2021 supply chain challenges may unexpectedly affect lead times. You will be notified of any changes in your lead time as quickly as possible.