U Shaped DeskThis desk with shelves and drawers is available in multiple finishes, Sienna Mahogany shown, and can be ordered with the opening facing left or right to determine the direction of the U shape. Included here is a two-drawer suspended pedestal, which can be swapped for a different model at your discretion. Quality backed by a 10-year manufacturer's warranty. This item is currently not available to purchase. Check out these related items: ![]()
Stacking Plastic Chair - Set of 30 with Dolly
$4,295.00
![]()
Antelope Canyon - Office Wall Art
$165.00
![]()
Conference Room Chair
$300.00
![]()
Mesh Back Office Chair
$740.00
![]()
Boat Shaped Conference Table with Brushed Metal Base
$1,380.00
![]()
Desk Mounted Power Hub
$190.00
|
Condition | New |
Brand | |
Series |
Available Finishes | Black Cherry, Park Walnut, Sienna Mahogany, Valley Grey |
Finish | Sienna Mahogany |
Parts List | AM-374L, A823, A825, A827, A838 |
Dimensions | 71" x 114" x 29" |
Material | Melamine |
Shape | Peninsula, U Shaped |
Features | Locking, Grommets, with Drawers, without Hutch, Drawers, Storage |
Capacity | 1 Person |
Please note that for items with multiple size options, the parts list may be slightly modified to meet the dimensions requested.
QTY | Part # | Description | List Price | Our Price | Line Total |
1 | AM-374L | Bullet Top Desk, Left CC Ext 71 x 30/42 | $783.00 | $510.00 | $510.00 |
1 | A823 | Bridge 48 x 24 | $288.00 | $190.00 | $190.00 |
1 | A825 | Credenza Desk Shell 71 x 24 | $420.00 | $275.00 | $275.00 |
1 | A827 | 2 Drawer Lateral File 36 x 23 x 29 | $960.00 | $625.00 | $625.00 |
1 | A838 | BF Hanging Ped 16 x 22 x 20 | $416.00 | $270.00 | $270.00 |
In-stock items typically leave our facility in 1 to 4 business days. If you chose standard dock to dock freight, your items will arrive to you in 2 to 10 business days. Large items may require lift gate service if you do not have a loading dock. Drawers ship fully assembled, most other items are shipped flat-boxed and require assembly. Please note that 2021 supply chain challenges may unexpectedly affect lead times. You will be notified of any changes in your lead time as quickly as possible.