Condition | New |
Brand | |
Series |
Available Finishes | Aspen, Espresso, Modern Walnut, Newport Gray, Silver Birch, White |
Finish | Modern Walnut |
Parts List | PLT3072, PLT2448, PLT2472, PLTUSUPPORT, PLTLEGLP24, PLTLEGLP30, PLTMDB72, PL1044OH/PLTLPHS20, PL44SGD, PL1007, CUSH1522, PLTAP1554S, PLTSDTM-SILVER, PLT60MS |
Dimensions | 72" x 102" x 30/66" |
Material | Aluminum, Glass, Laminate, Steel |
Shape | U Shaped |
Features | Locking, with Drawers, with Hutch, Doors, Drawers, Overhead Storage, Storage, with Wheels |
Capacity | 1 Person |
Please note that for items with multiple size options, the parts list may be slightly modified to meet the dimensions requested.
QTY | Part # | Description | List Price | Our Price | Line Total |
1 | PLT3072 | 72x30 Main Desk Top | $327.00 | $220.00 | $220.00 |
1 | PLT2448 | 48x24 Desk Top | $225.00 | $150.00 | $150.00 |
1 | PLT2472 | 72x24 Main Desk Top | $252.00 | $170.00 | $170.00 |
1 | PLTUSUPPORT | U-Configuration Support Beam | $90.00 | $60.00 | $60.00 |
2 | PLTLEGLP24 | Loop Leg 24 | $216.00 | $145.00 | $290.00 |
2 | PLTLEGLP30 | Loop Leg 30 | $230.00 | $155.00 | $310.00 |
2 | PLTMDB72 | Main Desk Beam 72 | $104.00 | $70.00 | $140.00 |
1 | PL1044OH/PLTLPHS20 | 71" Open Hutch with 20"H Support | $779.00 | $520.00 | $520.00 |
1 | PL44SGD | Silver Doors (Set of 2) | $207.00 | $140.00 | $140.00 |
1 | PL1007 | B/F Mobile Pedestal | $452.00 | $305.00 | $305.00 |
1 | CUSH1522 | Fabric Cushion for PL1007 | $132.00 | $90.00 | $90.00 |
1 | PLTAP1554S | 15x54 Acrylic Privacy Divider | $216.00 | $145.00 | $145.00 |
1 | PLTSDTM-SILVER | Panel Mounting Bracket | $63.00 | $45.00 | $45.00 |
1 | PLT60MS | Support Beam for 60" Tops - Pair | $46.00 | $30.00 | $30.00 |
In-stock items typically leave our facility in 1 to 4 business days. If you chose standard dock to dock freight, your items will arrive to you in 2 to 10 business days. Large items may require lift gate service if you do not have a loading dock. Drawers ship fully assembled, most other items are shipped flat-boxed and require assembly. Please note that 2021 supply chain challenges may unexpectedly affect lead times. You will be notified of any changes in your lead time as quickly as possible.