U Shaped Office DeskThis U shaped desk with storage is available in multiple finishes, Black Cherry shown, and is based on a peninsula main desk with your choice of left-hand or right-hand opening (left pictured). A credenza sits at the back, in which you can install one of several pedestal storage options. Quality backed by a 10-year manufacturer's warranty. This item is currently not available to purchase. Check out these related items: ![]()
High Back Accent Chair
$3,495.00
![]()
2 Person Reception Desk with Glass Transaction Counter
$3,240.00
![]()
Reversible L Shaped Office Desk with Keyboard Tray
$935.00
![]()
Fall at Sand Harbor - Office Wall Art
$165.00
![]()
Double-Tier Locker with Legs
$480.00
![]()
Simple Scandinavian Counter Stool
$415.00
|
Condition | New |
Brand | |
Series |
Available Finishes | Black Cherry, Park Walnut, Sienna Mahogany, Valley Grey |
Finish | Black Cherry |
Parts List | AM-374L, A823, A825, A838 |
Dimensions | 71" x 114" x 29" |
Material | Melamine |
Shape | Peninsula, U Shaped |
Features | Locking, Grommets, with Drawers, without Hutch, Drawers |
Capacity | 1 Person |
Please note that for items with multiple size options, the parts list may be slightly modified to meet the dimensions requested.
QTY | Part # | Description | List Price | Our Price | Line Total |
1 | AM-374L | Bullet Top Desk, Left CC Ext 71 x 30/42 | $783.00 | $510.00 | $510.00 |
1 | A823 | Bridge 48 x 24 | $288.00 | $190.00 | $190.00 |
1 | A825 | Credenza Desk Shell 71 x 24 | $420.00 | $275.00 | $275.00 |
1 | A838 | BF Hanging Ped 16 x 22 x 20 | $416.00 | $270.00 | $270.00 |
In-stock items typically leave our facility in 1 to 4 business days. If you chose standard dock to dock freight, your items will arrive to you in 2 to 10 business days. Large items may require lift gate service if you do not have a loading dock. Drawers ship fully assembled, most other items are shipped flat-boxed and require assembly. Please note that 2021 supply chain challenges may unexpectedly affect lead times. You will be notified of any changes in your lead time as quickly as possible.