U Shaped Office DeskThis large U shaped desk is available in multiple finishes, Sienna Mahogany shown, and the two-drawer suspended pedestal can be switched out for one of several in-desk storage offerings. The opposite side of the desk has a rounded peninsula shape for both accessibility and added workspace. Quality backed by a 10-year manufacturer's warranty. This item is currently not available to purchase. Check out these related items: ![]()
Bench Mount Bracket
$30.00
![]()
Bow Front L Shaped Desk with Drawers
$2,520.00
![]()
Black Free-Standing Mount Brackets - Lot of 200
$4,500.00
![]()
Drafting Stool with Wheels
$640.00
![]()
Modern U Shaped Desk with Storage
$9,425.00
![]()
4 Person Workstation with Privacy Panels
$6,340.00
|
Condition | New |
Brand | |
Series |
Available Finishes | Black Cherry, Park Walnut, Sienna Mahogany, Valley Grey |
Finish | Sienna Mahogany |
Parts List | AM-373N, A823, A825, A838 |
Dimensions | 71" x 108" x 29" |
Material | Melamine |
Shape | Peninsula, U Shaped |
Features | Locking, Reversible, Grommets, with Drawers, with Storage, without Hutch, Credenza, Drawers |
Capacity | 1 Person |
Please note that for items with multiple size options, the parts list may be slightly modified to meet the dimensions requested.
QTY | Part # | Description | List Price | Our Price | Line Total |
1 | AM-373N | Peninsula Desk Shell 71 x 36 | $629.00 | $410.00 | $410.00 |
1 | A823 | Bridge 48 x 24 | $288.00 | $190.00 | $190.00 |
1 | A825 | Credenza Desk Shell 71 x 24 | $420.00 | $275.00 | $275.00 |
1 | A838 | BF Hanging Ped 16 x 22 x 20 | $416.00 | $270.00 | $270.00 |
In-stock items typically leave our facility in 1 to 4 business days. If you chose standard dock to dock freight, your items will arrive to you in 2 to 10 business days. Large items may require lift gate service if you do not have a loading dock. Drawers ship fully assembled, most other items are shipped flat-boxed and require assembly. Please note that 2021 supply chain challenges may unexpectedly affect lead times. You will be notified of any changes in your lead time as quickly as possible.