EXP Express Panel Systems Cubicle Wall PanelThe Express Panel Systems cubicle walls have metal-to-metal, industry standard, wedge block and draw rod connections. The raceways are plastic snap on and are approximately 5 inches tall. Panels are stocked in 39 inch, 53 inch, 67 inch and 67 inch glazed top sections. Fabric color is a neutral gray with gray / silver edge trim. These modular panels can be installed in countless configurations to divide a workspace. This item is currently not available to purchase. Check out these related items:
|
Condition | New |
Brand | |
Series |
Color | Gray, Silver |
Material | Fabric, Metal |
SKU | Description | QTY | Price |
P-39X24 | 39" x 24" Silver Aspen Cubicle Wall | 1 | $140.00 |
P-39X30 | 39" x 30" Silver Aspen Cubicle Wall | 1 | $180.00 |
P-39X36 | 39" x 36" Silver Aspen Cubicle Wall | 1 | $215.00 |
P-39X48 | 39" x 48" Silver Aspen Cubicle Wall | 1 | $225.00 |
P-53X24 | 53" x 24" Silver Aspen Cubicle Wall | 1 | $165.00 |
P-53X30 | 53" x 30" Silver Aspen Cubicle Wall | 1 | $215.00 |
P-53X36 | 53" x 36" Silver Aspen Cubicle Wall | 1 | $240.00 |
P-53X48 | 53" x 48" Silver Aspen Cubicle Wall | 1 | $275.00 |
P-67X24 | 67" x 24" Silver Aspen Cubicle Wall | 1 | $200.00 |
P-67X30 | 67" x 30" Silver Aspen Cubicle Wall | 1 | $275.00 |
P-67X36 | 67" x 36" Silver Aspen Cubicle Wall | 1 | $285.00 |
P-67X48 | 67" x 48" Silver Aspen Cubicle Wall | 1 | $320.00 |
P-GF67x24 | 67" x 24" Glazed Silver Aspen Cubicle Wall | 1 | $280.00 |
P-GF67x30 | 67" x 30" Glazed Silver Aspen Cubicle Wall | 1 | $370.00 |
P-GF67x36 | 67" x 36" Glazed Silver Aspen Cubicle Wall | 1 | $395.00 |
P-GF67x48 | 67" x 48" Glazed Silver Aspen Cubicle Wall | 1 | $455.00 |
In-stock items typically leave our facility in 1 to 4 business days. If you chose standard dock to dock freight, your items will arrive to you in 2 to 10 business days. Large items may require lift gate service if you do not have a loading dock. Drawers ship fully assembled, most other items are shipped flat-boxed and require assembly. Please note that 2021 supply chain challenges may unexpectedly affect lead times. You will be notified of any changes in your lead time as quickly as possible.