Racetrack Conference Table with Storage and WhiteboardThe boardroom office furniture set by Cherryman has everything you'll need for presentations, meetings and storage. All components in the picture have a Black Cherry finish that includes a storage credenza, two 65" tall bookcases, presentation board and a racetrack conference table that can be ordered in different sizes. There are several finish options available and it comes with a 10-year manufacturer's warranty.
Estimated Arrival - Order today and receive as soon as Fri. Jun. 7 - Jun. 21 |
Condition | New |
Brand | |
Series | |
Parts List | A723, A540, A827, A425, (2) A829, A120 |
Available Finishes | Black Cherry, Park Walnut, Sienna Mahogany, Valley Grey |
Finish | Black Cherry |
Material | Aluminum, Melamine |
Shape | Racetrack |
Features | with File Cabinet, with Storage, with Storage Cabinet, Doors, Dry Erase, Adjustable Shelves, Bookshelf, Drawers, Filing Cabinet, Shelves, Storage |
Capacity | 6 Person, 8 Person, 10 Person, 12 Person, 14 Person, 16 Person, 18 Person, 20 Person |
Please note that for items with multiple size options, the parts list may be slightly modified to meet the dimensions requested.
QTY | Part # | Description | List Price | Our Price | Line Total |
1 | A723 | 8 FT Racetrack Conference Table | $885.00 | $575.00 | $575.00 |
1 | A540 | 2 Door Storage Cabinet - 36" x 23" x 29" | $550.00 | $360.00 | $360.00 |
1 | A827 | 2 Drawer Lateral File 36 x 23 x 29 | $1049.00 | $680.00 | $680.00 |
1 | A425 | Top for Lateral or Storage Credenza 71 x 23 | $233.00 | $155.00 | $155.00 |
2 | A829 | 5 Shelf Bookcase 36 x 15 x 65 | $620.00 | $405.00 | $810.00 |
1 | A120 | Presentation Board 48 x 48 | $719.00 | $470.00 | $470.00 |
In-stock items typically leave our facility in 1 to 4 business days. If you chose standard dock to dock freight, your items will arrive to you in 2 to 10 business days. Large items may require lift gate service if you do not have a loading dock. Drawers ship fully assembled, most other items are shipped flat-boxed and require assembly. Please note that 2021 supply chain challenges may unexpectedly affect lead times. You will be notified of any changes in your lead time as quickly as possible.